Final Grading and Berm Formation
9:30
15:32
115.9K views
At 9:30 in
FAILING house foundation 2/2 . 4 k video
What happens here
With the retaining walls in place, a skid steer and manual labor are used to establish the final grade of the soil, ensuring a consistent slope away from the house. A berm, or raised edge, is carefully shaped along the perimeter of the regraded area. This berm is designed to channel water runoff effectively, preventing it from pooling near the foundation and directing it towards the established drainage path.
Goal: A precise grade is established with fill soil and a berm is created to direct water effectively away from the house.
Tools and materials
- Mini-Excavator Bobcat E325
- Shovels and Rakes
- Skid Steer Bobcat T180
- Dry Fill Soil Unspecified
What they say
(1,216 characters)Hide
What they say
(1,216 characters)Auto-generated from the video audio.