Foundation Waterproofing and Drainage Channeling
3:56
15:32
115.9K views
At 3:56 in
FAILING house foundation 2/2 . 4 k video
What happens here
After the foundation is fully exposed and problematic roots are removed, a yellow, dimpled waterproofing board (likely a drainage board or insulation board with drainage properties) is installed against the foundation wall. This board provides a protective barrier and creates a pathway for water to flow down to a newly formed drainage trench. This trench will eventually house a drainage system to effectively divert water away from the foundation.
Goal: The exposed foundation is treated with a yellow waterproofing board, and a drainage trench is established to collect and redirect water.
Tools and materials
- Yellow Waterproofing Board
What they say
(518 characters)Hide
What they say
(518 characters)Auto-generated from the video audio.