Lay First Blocks, Geo-grid, and Hand Backfill
At 2:37 in
Double Terraced Retaining wall crashes down- Last day
What happens here
Workers place the first course of retaining wall blocks into the prepared trench, ensuring each block is correctly aligned and level. They use a string line to maintain a straight wall face and a level to check for proper elevation. Geo-grid material is laid over the blocks, extending back into the excavated area, to provide structural reinforcement. Gravel is then carefully shoveled by hand behind the blocks, covering the geo-grid. Manual compaction is performed close to the wall blocks to avoid damaging them with heavy machinery, a critical step for proper backfilling.
Goal: This step details the precise placement of the first layer of retaining wall blocks, the installation of geo-grid for reinforcement, and the initial backfilling with gravel, compacted manually.
Tools and materials
- Geo-grid — Reinforcing the soil behind the retaining wall for stability
- Hammer/Mallet Various — Tapping blocks into place and driving pins
- Levels Various — Ensuring blocks are perfectly level and plumb
- Pinning Rods — Securing layers of blocks together
- Retaining Wall Blocks Versa-Lok — Building the main structure of the retaining wall
- Shovels Various — Placing gravel behind the blocks and light excavation
- String Line Various — Maintaining a straight line for the retaining wall face
- Gravel — Providing drainage and structural support as backfill material