Continue Block Laying, Breaking, and Backfilling
At 5:41 in
Double Terraced Retaining wall crashes down- Last day
What happens here
More courses of retaining wall blocks are laid, with Geo-grid reinforcement continuing between layers as specified by the wall design. The skid steer is used to transport additional pallets of blocks to the work area. Blaine, the project foreman, demonstrates how to carefully break a block for an outside corner using a hammer and chisel, scoring it first to create a clean fracture line. Compaction close to the wall must be done manually, using the back of a shovel or even one's feet, to avoid damaging the wall or disturbing the geo-grid. Mechanized compaction is only allowed at least 3 feet away from the wall's backside. The backfill behind the blocks is maintained with a minimum of 12 inches of rock.
Goal: This step involves continuing to build the retaining wall by laying blocks, creating custom corner blocks, and performing meticulous backfilling with gravel and manual compaction.
Tools and materials
- Geo-grid — Reinforcing the soil behind the retaining wall
- Hammer and Chisel Various — Cutting specific shapes for corner blocks by hand
- Level Various — Checking block alignment
- Pinning Rods — Securing blocks
- Retaining Wall Blocks Versa-Lok — Continuing the wall structure
- Shovel Various — Manual compaction and moving gravel
- Skid Steer — Transporting blocks and gravel
- String Line Various — Maintaining wall alignment
- Gravel — Backfilling and drainage behind the wall