Final Backfill, Cap Installation, and Completion
At 14:14 in
Double Terraced Retaining wall crashes down- Last day
What happens here
After all the cap blocks are cut and dry-fitted, the remaining native soil is brought in and backfilled behind the wall up to the intended finished grade. The skid steer is used to efficiently move and spread the soil. The wall is then stepped up to match the grade behind it, integrating seamlessly with the landscape. Next, the cap blocks are permanently installed by first cleaning them thoroughly with a leaf blower to remove any dust or debris. Construction adhesive is then applied in a thin, even bead to the top of the wall blocks. The cap blocks are carefully placed onto the adhesive, completing the retaining wall structure. The project ends with the team marking their initials and the date on a block, celebrating its completion.
Goal: This final stage involves completing the backfilling with native soil, precisely installing the cap blocks using adhesive, and ensuring the finished wall integrates with the landscape.
Tools and materials
- Caulking Gun Various — Applying construction adhesive for the cap blocks
- Leaf Blower — Cleaning the top of the wall blocks before applying adhesive for caps
- Marker GearWrench — Marking initials and date on a hidden block for project completion
- Skid Steer — Moving and spreading native soil for final backfill and grading
- Construction Adhesive Various — Securing the cap blocks to the retaining wall
- Native Soil — Final backfill and grading behind the wall
- Retaining Wall Cap Blocks Versa-Lok — The top layer of the retaining wall