Initial Excavation and Base Compaction
0:22
18:07
186.1K views
At 0:22 in
Double Terraced Retaining wall crashes down- Last day
What happens here
The crew begins the retaining wall installation by using a mini excavator to dig out the necessary trench for the wall's foundation. Existing old retaining wall blocks are removed during this process. The backfill soil, which is suitable for reuse, is separated from the debris that needs to be discarded. A plate compactor is then used to compact the initial soil bed, ensuring a stable and level base for the first course of blocks.
Goal: This step involves excavating the trench, removing old blocks, separating reusable soil, and compacting the base layer for the new retaining wall.
Tools and materials
- Mini Excavator — Digging the trench and moving large quantities of soil
- Plate Compactor — Compacting the soil base for stability
- Shovels Various — Manual digging and shaping of the trench
- Skid Steer — Moving excavated soil and gravel for backfilling
What they say
(706 characters)Hide
What they say
(706 characters)Auto-generated from the video audio.