Load Log and Plan Initial Cuts
7:13
25:54
45.4K views
At 7:13 in
Do you want a Sawmill?
What happens here
Wear appropriate personal protective equipment, including ear protection (like 3M Worktunes) and safety gloves, before starting the mill. Position a red oak log onto the sawmill's deck. In this instance, a LogOX 4-in-1 Forestry Multi-Tool is used to roll and position a heavy log. Take measurements of the log to plan your cuts. The goal is to maximize usable lumber and minimize waste. For this log, the strategy is to mill it into a square 'cant' first, then cut 1-inch thick pieces for 'dunnage' (stickers used for stacking lumber to air dry) and finally, 2-inch thick slabs for tabletops or bar tops.
Goal: Safely load the log and prepare for milling by planning cuts.
Tools and materials
- Ear Protection 3M Worktunes — Protecting hearing from loud machinery
- LogOX 4-in-1 Forestry Multi-Tool LogOX — Rolling and positioning logs on the sawmill deck
- Safety Glasses — Protecting eyes from flying debris
- Safety Gloves SRF — Protecting hands while handling logs and equipment
- Tape Measure — Measuring the log dimensions for cut planning
- Woodmizer LT40 Sawmill Woodmizer — The primary machine being operated
- Red Oak Log N/A — The wood to be milled