Skip to main content

Final Tensioning and Safety Guards

19:28
25:54
45.4K views

At 19:28 in

Do you want a Sawmill?

What happens here

After installing the new blade, start the sawmill engine again. Immediately observe the blade tension gauge as the blade begins to run. You will notice a slight drop in PSI as the new blade stretches and settles. Use the tensioning handle to tighten the blade, bringing the tension back up to the recommended 2800-3000 PSI while the mill is running. This fine-tuning ensures optimal performance and prevents wavy cuts. Keep a close eye on the tension during the first few cuts, as new blades may require additional minor adjustments. Once tensioned, replace all side covers and protective flaps on the saw head. Never operate the sawmill with these guards removed, as it poses a significant safety risk.

Goal: Achieve final blade tension and restore safety guards.

Tools and materials

  • Blade Tension Gauge N/A — Measuring the blade tension in PSI
  • Side Covers N/A — Protecting the blade mechanism
  • Tensioning Handle N/A — Adjusting the blade tension
  • Woodmizer LT40 Sawmill Woodmizer — The primary machine being operated and maintained