With the majority of the concrete removed, the focus shifts to clearing any remaining buried utilities and refining the subgrade of the pool basin. A worker manually cuts existing PVC lines that were part of the pool's plumbing system. This is done carefully with a saw to ensure controlled disconnection, preventing them from being pulled further down the line or creating new problems. The excavator also works to remove any lingering concrete fragments or other debris from the pool bottom, ensuring a clean and consistent base for the backfill material.
Goal: Remove all remaining utilities and debris from the pool basin.
Tools and materials
- Kobelco Excavator Kobelco — Removing remaining debris and larger fragments from the pool base
- PVC Pipe Cutter/Saw — Cutting and disconnecting PVC utility lines
- Shovel — Manual removal of smaller debris or assisting in cutting lines