Initial Concrete Pool Demolition and Debris Loading (Phase 1)
0:00
15:09
2.2M views
At 0:00 in
Do we Fire him?
What happens here
The project begins with the demolition of a large concrete swimming pool. A Kobelco excavator is used to break up the concrete. Initially, large boulders are lifted by the excavator's bucket and dropped into the pool to shatter the concrete base and walls into smaller, manageable pieces. This technique allows for efficient initial breakdown of the thick concrete, making it easier for the excavator's bucket to further process the material. The broken concrete is then loaded into a waiting dump truck for removal from the site.
Goal: Break down the concrete swimming pool structure into large, manageable pieces and begin debris removal.
Tools and materials
- Dump Truck — Hauling away demolished concrete debris
- Kobelco Excavator Kobelco — Breaking concrete, moving debris, and loading trucks
- Large Boulders N/A — Shattering large sections of concrete pool walls and base
What they say
(551 characters)Hide
What they say
(551 characters)Auto-generated from the video audio.