Pool Basin Backfilling and Compaction
At 7:20 in
Do we Fire him?
What happens here
Structural fill dirt is brought in by a dump truck and strategically placed around the pool basin. A Kobelco excavator and an ASV RT-75 skid-steer loader work in tandem to spread this fill material into the deep excavation. The fill is placed in thin lifts, typically 6-12 inches, and the heavy machinery then drives over it repeatedly to achieve compression compaction. This process is crucial to ensure that the ground is stable and will not settle over time, which is especially important for a large, deep excavation like a swimming pool. The compaction must be sufficient to prevent settlement but not so dense that it prevents future plant growth.
Goal: Fill the pool basin with structural fill and compact it in thin layers to prevent future settlement.
Tools and materials
- ASV RT-75 Skid-Steer Loader ASV — Spreading and thorough compaction of fill dirt in thin layers
- Dump Truck — Delivering structural fill to the site
- Kobelco Excavator Kobelco — Spreading and initial compaction of fill dirt
- Structural Fill Dirt N/A — Filling the excavated pool basin
What they say
(839 characters)Hide
What they say
(839 characters)Auto-generated from the video audio.