Carefully lay the first course of retaining wall blocks directly onto the compacted gravel base. Use a level and measuring tape to ensure each block is perfectly level and aligned with the established string lines. This initial course is crucial for the overall straightness and stability of the wall. Avoid placing the entire footing at once to prevent water accumulation from rainfall. Only prepare as much footing as can be safely completed and backfilled to prevent erosion and structural compromise.

Goal: Place the initial layer of retaining wall blocks directly onto the compacted gravel base, ensuring they are level and properly aligned.

Tools and materials

  • Level
  • Measuring Tape
  • Retaining Wall Blocks N/A

What they say

Hide

we don't dig out the entire footing for the retaining wall all at once because if we get a thunderstorm coming through there that trench will trap water so we only dig out as much as we can safely base and fill back in below this bottom layer of block is just supposed to be 6 in of rock but you'll probably notice that we double or triple that in many places and we also widen out the base as well it's very cheap insurance to make sure that that wall doesn't have any deflection down the