Skip to main content

Fill and Compact Gravel Base

9:16
15:14
90.5K views

At 9:16 in

Creating a yard off a SKETCHY slope

What happens here

Once the trenches are dug to the correct specifications, begin backfilling them with gravel. Use a skid steer to efficiently move and deposit the gravel into the trenches. Then, use shovels to spread and level the gravel evenly within both the wider geogrid footing and the narrower block footing. After spreading, use a plate compactor to thoroughly compact the gravel, ensuring a dense and stable base. Repeat the process of adding gravel and compacting in layers until the desired height and density are achieved. If the soil is dry, wet it slightly before compacting to achieve better results and reduce dust.

Goal: Backfill the excavated trenches with gravel and thoroughly compact it to create a stable, level foundation for the retaining wall.

Tools and materials

  • Hose
  • Plate Compactor (Tomahawk)
  • Shovel
  • Skid Steer (Kubota SVL65)
  • Gravel N/A

What they say

Hide

critical that we get this step right so we don't get any future [Music] settlement damn it [Music]

Auto-generated from the video audio.