Laying Subsequent Block Courses and Reinforcement
16:05
25:06
3.1M views
At 16:05 in
Crazy Neighbor Calls the Building Inspector on us
What happens here
The process of laying successive courses of blocks is shown in a time-lapse. This includes cleaning each layer, setting the pins, aligning the blocks with a string line, and hammering them into place. Backfilling with crushed rock and compacting it is repeated for each course, ensuring the wall's integrity as it rises. GeoGrid is installed at appropriate intervals to reinforce the soil behind the wall.
Goal: Successive courses of blocks are laid, cleaned, pinned, and aligned, with intermittent backfilling and compaction, including the installation of GeoGrid for soil reinforcement.
Tools and materials
- Interlocking Retaining Wall Blocks
- Kubota SVL 65 Compact Track Loader
- Leaf Blower
- Level
- Plate Compactor
- Retaining Wall Pins
- Rubber Mallet/Sledgehammer
- Scraper
- String Line
- Crushed Rock
- GeoGrid
What they say
(165 characters)Hide
What they say
(165 characters)Auto-generated from the video audio.