Backfilling with Crushed Rock
14:40
25:06
3.1M views
At 14:40 in
Crazy Neighbor Calls the Building Inspector on us
What happens here
Following the laying of the blocks, the area behind the wall is backfilled with crushed rock. The compact track loader dumps the rock directly into the space, and workers use rakes and shovels to evenly spread and compact it. This rock layer provides essential drainage and additional structural support, preventing hydrostatic pressure buildup behind the wall.
Goal: The area behind the retaining wall is backfilled with crushed rock and leveled to provide crucial drainage and additional structural stability.
Tools and materials
- Kubota SVL 65 Compact Track Loader
- Rakes
- Shovels
- Crushed Rock
What they say
(413 characters)Hide
What they say
(413 characters)Auto-generated from the video audio.