After preparing the trench, a generous layer of crushed rock is added to form the base. Workers use shovels and rakes to evenly spread and level the rock. The video emphasizes 'overkilling' the base material and drainage zone, using more rock than typically specified, to ensure exceptional stability and prevent future issues, highlighting that rock is cheaper than fixing a failed wall.

Goal: A thick layer of crushed rock is added to the trench and leveled to create a robust base, ensuring superior stability and drainage for the retaining wall.

Tools and materials

  • Rakes
  • Shovels
  • Crushed Rock

What they say

Hide

can make it not pin all the way. Um, so yeah, once you got that cleaned off, you know, you want to check like right here, this is going to have to come off. It's a little bit of little bit of dirt, but that's enough to throw the course off. So, need to get my scrape. Now, this is where you have to be picky and where a lot of guys aren't, unfortunately. any kind of obstructions on the top of these blocks will be like the princess and the pee, right? You got all these mattresses and a little tiny pee on the bottom mattress and that's going to throw everything off. Well, on a retaining wall, if you let any obstructions be on those blocks, as the wall gets taller, you're going to start to see it. You won't see it if you only stack one or two courses on top of the obstruction. But if you've got 10 courses or worse yet 20 or 30 courses to go on top of an instruction, by the time you get to the top, your retaining wall is failed. This is where you've got to babysit every single course and make sure that you get those blocks clean, especially where you lay down grid because the grid will trap the debris and not let you get it cleaned off right. So, you've got to do this step before you lay the grid down. As you can see on the row below it. Rock is cheap, but fixing a retaining wall isn't. This base is not in the bid. But we know as contractors, if we put this much base material down, there's not much of a chance we're going to get a call back. Hey, something happened to my wall in 3 to four to 5 years. This is cheap insurance for us. So, we overkill the base. We overkill