Final Landscaping and Sod Installation
18:20
25:06
3.1M views
At 18:20 in
Crazy Neighbor Calls the Building Inspector on us
What happens here
With the retaining wall structural work completed, the final landscaping begins. The compacted structural fill is tilled using a hydro-bucket attachment on the compact track loader to prepare it for planting. Black dirt is then brought in and spread evenly over the tilled area. Finally, rolls of sod are laid across the prepared surface to establish a finished lawn.
Goal: The structural fill behind the completed retaining wall is tilled, covered with black dirt, and then finished by laying sod for a complete landscape.
Tools and materials
- Hydro-bucket attachment
- Kubota SVL 65 Compact Track Loader
- Rakes
- Black Dirt
- Sod Rolls
What they say
(973 characters)Hide
What they say
(973 characters)Auto-generated from the video audio.