Site Preparation and Footing Layout

2:06
9:41
18.8K views

At 2:06 in

Building an AMAZING tiny home FAST! #cheap #fast #tinyhouse

What happens here

Begin by assessing the build site, which is located on a sloped terrain. The ground is cleared of debris and vegetation to create a workable area. Using strings and stakes, the perimeter and internal footing locations for a 24-foot diameter yurt platform are marked out. Orange spray paint is used to clearly identify each footing spot on the soil, ensuring precise placement for the auger.

Goal: The first step involves clearing the build site and accurately marking the locations for the yurt's structural footings. This ensures the foundation is correctly aligned and prepared for the subsequent drilling and post-setting.

Tools and materials

  • Measuring Tape
  • Orange Spray Paint
  • Stakes
  • String

What they say

Hide

us a hand so sit back relax and hope you guys enjoy today's build let's get things started okay so before we start drilling let's see what we've got the orange markers indicate our our footings so we've got a center line and then we've got the perimeter footings all marked out this is going to be a 24 foot yurt and we're actually going to be building it on us