Install Subfloor and Prepare for Yurt Walls
At 9:12 in
Building an AMAZING tiny home FAST! #cheap #fast #tinyhouse
What happens here
Lay plywood subfloor panels directly onto the completed and insulated floor joist system. Use construction screws and a cordless drill to firmly attach the plywood to the joists, creating a solid walking surface. Subsequently, position and fasten the wooden door frames onto the subfloor. Then, begin expanding and attaching the wooden lattice work (khana) that forms the circular walls of the yurt, followed by installing the roof rafters, which extend from the lattice walls to a central crown ring. A large white tarp-like material is then pulled over the roof rafters to provide initial weather protection.
Goal: Secure plywood subfloor panels over the insulated joists and begin the installation of the yurt's lattice wall and roof framing elements.
Tools and materials
- Central Crown Ring
- Construction Screws
- Cordless Drill
- Ladder/Scaffolding
- Plywood Subfloor Panels
- Roof Rafters
- Wooden Door Frames
- Yurt Lattice Work (Khana)