Insulate and Sheath Floor Cavity
At 8:20 in
Building an AMAZING tiny home FAST! #cheap #fast #tinyhouse
What happens here
To prepare the elevated platform for varying temperatures, install insulation between the floor joists. This creates a 'false cavity' to retain heat during cold winters and block heat during hot summers. Use a combination of rigid insulation boards and batt insulation (like fiberglass or mineral wool) to fill the joist bays. Ensure a snug fit to prevent thermal bridging and air leaks. After insulation is in place, cover the entire framed deck with sheathing, typically plywood or OSB, to create a solid subfloor. Secure the sheathing with deck screws or ring-shank nails.
Goal: Place insulation within the joist bays of the deck frame to create a false cavity. Cover the top of the joists with protective sheathing to prepare for the yurt's floor.
Tools and materials
- Circular Saw
- Drill/Driver
- Tape Measure
- Utility Knife
- Batt Insulation (e.g
- fiberglass
- mineral wool) N/A
- Deck Screws or Ring-Shank Nails N/A
- Plywood or OSB Sheathing N/A
- Rigid Insulation Boards N/A
What they say
(805 characters)Hide
What they say
(805 characters)Auto-generated from the video audio.