At 0:53 in
Building a Retaining wall start to finish #1
What happens here
Following demolition, the site requires significant excavation to prepare for the new retaining wall. The ASV RT-75 Posi-Track skid-steer loader continues to cut away the existing bank, creating a new, stable slope where the retaining wall will be built. This excavation also widens the existing driveway. The removed soil is piled in accessible areas for sorting.
Goal: Excavate and reshape the bank to accommodate the new retaining wall and steps.
Tools and materials
- ASV RT-75 Posi-Track ASV — Excavating and moving large quantities of soil
- Bucket attachment ASV — Scooping and moving soil