Lay and Level Base Course Blocks
At 2:50 in
Building a retaining wall #2 - "How we Base walls"
What happens here
Blaine demonstrates the critical process of laying the base course of interlocking blocks. Each block must be individually leveled, and then leveled relative to its adjacent blocks. He explains that blocks should be initially placed slightly higher than the desired final height and then carefully tapped down with a dead blow hammer to settle them into the gravel base. This method allows for precise adjustments, crucial for the long-term stability of the wall. The back (machine-finished) side of the block is used for leveling to ensure accuracy, as the front has a rough, uneven texture.
Goal: Properly install the initial layer of interlocking blocks with precise leveling.
Tools and materials
- Dead Blow Hammer
- Interlocking Blocks
- Level
- Safety Gloves
What they say