The team continues to install additional layers of interlocking blocks for the retaining wall, ensuring each course is properly aligned and level. Geogrid, a critical reinforcement material, is laid at various heights within the wall structure to enhance stability and prevent the wall from bowing or collapsing under soil pressure. A skid steer is used to efficiently move and dump gravel behind the wall, which is then spread and compacted in layers. The process of backfilling is just as important as the block-laying to ensure proper drainage and load distribution.

Goal: Build up the retaining wall with subsequent block courses, integrating geogrid for reinforcement and backfilling effectively.

Tools and materials

  • Geogrid
  • Interlocking Blocks
  • Plate Compactor
  • Shovels
  • Skid Steer

What they say

Hide

yep i do actually i think i had like four while blaine is facing joey is slagging the block off and that's basically just smoothing out the tops pretty close to level looks like it's coming down a little bit if you go just a lot all this block is driving weight on the scent compared to measuring both of them so it almost looks like it's pretty close to level a little bit lower [Music] but you could get this corner to be level but this block should be dipping down diving down over here check both both corners okay [Applause] sometimes they're tricky aren't they sometimes they are especially when you're on camera [Music] all right well i'll let you keep working on that so what blaine does is on the back side of the blocks to make just to level everything out you can see he runs that level all the way he uses a switches to a four foot level and then everything on the backside is is a straight face as well he doesn't use the front side because it's got a rough face right so if you look right here if you use that put that level on the front of it then he's not necessarily as accurate yeah so like right here you can see this yeah this bump right here throws it off so that'll throw you off if you're trying to use the front but on the back side it's a machine finished edge so that's why we use the back side of the block we also rope we also use what's called a rope trick i don't know if these guys get you ever use the rope trick when you're backfilling aggregate rope trick nothing never saw it never seen the rope trick on commercial sites when we would have 100 to 200 feet to to rock we would take a rope and stick it in the pin slots all the way down and then we could just put the rock in place and if it got on top of the block we didn't care because we flipped the rope out and all the rock would disappear out of our pin slots that makes a lot of sense yeah it's just a but if you don't have to do it you don't have to do it you know even just you know short little pieces like that would help yeah instead of having to pick the rock out of there yep yep because that is the sucky part about these blocks is getting rock in there getting rock in there and especially when it's this size rock so it fits just like that and then you gotta get reach in and you gotta physically pick it out but that is a minor point overall for all of the benefits that you get with this block i'd never use any other block personally but i don't know you've been basing for as many years as i…