Lay Drainage Barrier and Grade Soil
1:35
18:56
48.2K views
At 1:35 in
$5000 job in a day part 3
What happens here
Once the boulder wall is complete, unroll and lay a non-permeable poly plastic sheet against the house foundation, behind the newly built retaining wall. This acts as a moisture barrier to prevent water intrusion. Subsequently, use the mini loader to backfill the area with soil, rough grading it to the desired contours, ensuring proper water runoff away from the foundation. The rough grading should account for subsequent compaction and final layering.
Goal: Lay non-permeable poly sheeting against the foundation as a drainage barrier, then backfill and rough grade the soil around the newly built retaining wall.
Tools and materials
- Mini Loader
- Shovels/Rakes
- Non-permeable Poly Plastic Sheeting
- Soil/Dirt