Backfill and Compact Soil
1:55
18:56
48.2K views
At 1:55 in
$5000 job in a day part 3
What happens here
After the initial layers of the retaining wall are in place, begin backfilling the area behind the wall with soil and compacting it. Use a 'jumping jack' compactor (Wacker Neuson BS 50-2i) for effective compaction of clay-rich soil, ensuring a stable base for the air conditioner pad that will be placed later. Another worker assists by leveling the soil with a shovel as the compactor is used.
Goal: Backfill soil behind the retaining wall and use a jumping jack compactor to ensure thorough compaction, especially where an air conditioner pad will be installed.
Tools and materials
- Shovel
- Backfill Soil Local topsoil/clay mix
What they say
(270 characters)Hide
What they say
(270 characters)Auto-generated from the video audio.