Step 2 · Prepare the Site
Remove any vegetation, rocks, or debris from the shed footprint. Ensure the ground is level. If the area is sloped, you may need to excavate and build up certain areas to create a flat base. Mark the perimeter of the shed location accurately using stakes and string lines.