Skip to main content
Stesso
BrowseMy ProjectsBlog
Log inSign up
Stesso

Step 7 · Curing and Final Checks

The installation is mechanically complete, but the mortar must now fully cure to provide the necessary strength. Follow the mortar manufacturer's instructions, but generally, you must wait a minimum of 24 to 48 hours. Do not allow anyone to stand in the pan or place any heavy objects on it during this time. After the curing period, step into the center of the pan and shift your weight around. It should feel completely solid, with no flexing, creaking, or movement. If it feels solid, the installation is successful and you can proceed with installing cement board and tile.

Stesso
BrowseMy Projects
Sign in

Step 7 · Curing and Final Checks

The installation is mechanically complete, but the mortar must now fully cure to provide the necessary strength. Follow the mortar manufacturer's instructions, but generally, you must wait a minimum of 24 to 48 hours. Do not allow anyone to stand in the pan or place any heavy objects on it during this time. After the curing period, step into the center of the pan and shift your weight around. It should feel completely solid, with no flexing, creaking, or movement. If it feels solid, the installation is successful and you can proceed with installing cement board and tile.

Tools and Materials

← Project

How to Install and Level a Shower Pan Base

Step 7 of 7·5 min left

Subfloor Preparation and Dry Fit
45 mins6 itemsIntermediate
Install the Drain Fitting
20 mins6 itemsIntermediate
Prepare the Mortar Bed
20 mins9 itemsIntermediate
Apply Mortar and Set the Pan
15 mins7 items
Level and Secure the Pan
20 mins3 itemsAdvanced
Connect the Drain Pipe
15 mins6 itemsAdvanced
7
Curing and Final Checks
5 mins1 itemsBeginner
Prev
Next