Step 3 · Prepare the Mortar Bed

Lay a sheet of roofing felt or heavy-duty builder's paper over the subfloor area where the pan will sit. This acts as a slip sheet, preventing the mortar from bonding directly to the wood and allowing for micro-movements. In a 5-gallon bucket, add the dry mortar mix (a sand/topping mix is ideal). Slowly add water while mixing with a power drill and mixing paddle. Continue mixing until you achieve a thick, stiff consistency, similar to peanut butter. It should be able to hold its shape when formed into a mound and not be runny or soupy.

Stesso
BrowseMy Projects
Sign in

Step 3 · Prepare the Mortar Bed

Lay a sheet of roofing felt or heavy-duty builder's paper over the subfloor area where the pan will sit. This acts as a slip sheet, preventing the mortar from bonding directly to the wood and allowing for micro-movements. In a 5-gallon bucket, add the dry mortar mix (a sand/topping mix is ideal). Slowly add water while mixing with a power drill and mixing paddle. Continue mixing until you achieve a thick, stiff consistency, similar to peanut butter. It should be able to hold its shape when formed into a mound and not be runny or soupy.

Tools and Materials

← Project

How to Install and Level a Shower Pan Base

Step 3 of 7·1.3 hr left

Subfloor Preparation and Dry Fit
45 mins6 itemsIntermediate
Install the Drain Fitting
20 mins6 itemsIntermediate
3
Prepare the Mortar Bed
20 mins9 itemsIntermediate
4
Apply Mortar and Set the Pan
15 mins7 items
5
Level and Secure the Pan
20 mins3 itemsAdvanced
6
Connect the Drain Pipe
15 mins6 itemsAdvanced
7
Curing and Final Checks
5 mins1 itemsBeginner
Prev
Next