Step 6 · Final Inspection and Water Turn-On

Once all components are installed, perform a final inspection. Check that all covers are securely fastened and that there are no exposed areas of pipe, sharp edges, or connection nuts. The goal is complete protection. Once you are satisfied with the installation, slowly turn the angle stop valve handles counter-clockwise to restore the water supply. Open the faucet and check for any leaks at the valve and supply line connections. If everything is dry and secure, the installation is complete.