Skip to main content

Step 5 · Install Supply Line and Valve Covers

Slide the pre-molded valve cover over the angle stop handle and body. Ensure it fits securely and covers all sharp edges. Next, take the corresponding cut piece of supply line tubing. These pieces are usually pre-slit. Open the slit and wrap the cover around the flexible water supply line, starting from the top of the valve cover and working your way up to the faucet connection. Press the seam together to close it. Repeat the entire process for the second valve and supply line. Ensure both covers are secure and conceal the plumbing completely.

Install Supply Line and Valve Covers - How to Install an ADA-Compliant Under-Sink Plumbing Shield - Stesso