Prepare Base and Lay First Course of Wall
3:09
24:25
113K views
At 3:09 in
We hit a Buried Line -on the Last job of the season.
What happens here
The excavated area for the new window well retaining wall was prepared by laying down a layer of geogrid for soil stabilization. A bed of clean gravel was then spread and thoroughly compacted using a plate compactor to create a solid foundation. The first course of interlocking retaining wall blocks was carefully laid on this prepared base, ensuring precise alignment and levelness as the foundation for the entire wall structure.
Goal: A stable base was established using gravel and compacted, followed by the careful placement of the first course of interlocking retaining wall blocks on a geogrid layer to ensure proper alignment and stability.
Tools and materials
- Clean Gravel
- Geogrid
- Plate Compactor
- Retaining Wall Blocks
- Shovels and Rakes