Install Top Cap Blocks and Final Sealing
17:37
24:25
113K views
At 17:37 in
We hit a Buried Line -on the Last job of the season.
What happens here
The top course of cap blocks was carefully placed on the finished retaining wall. Each cap block was precisely aligned to create a smooth, level surface. Construction adhesive was applied underneath each cap block to permanently bond them to the wall, creating a 'no-gap' top that enhances both the structural integrity and the aesthetic appeal of the completed window well.
Goal: The final step involved installing the top cap blocks, carefully aligning them, and securing them with construction adhesive to create a durable and aesthetically pleasing finish.
Tools and materials
- Caulking Gun
- Construction Adhesive
- Rubber Mallet
- Top Cap Blocks
What they say
(1,232 characters)Hide
What they say
(1,232 characters)Auto-generated from the video audio.