Prepare Retaining Wall Base

2:41
12:46
64.1K views

At 2:41 in

We find Buried problems

What happens here

Once the main trench is dug to the required depth, the base where the first course of blocks will sit must be compacted. A vibratory plate compactor (often referred to as a tamper) is used to ensure a solid, stable, and level foundation. This step is critical for the structural integrity and longevity of the retaining wall. Workers use shovels, rakes, and levels to precisely prepare the base.

Goal: After initial excavation, compact the trench base thoroughly and level it. This forms the stable foundation for the first course of retaining wall blocks.

Tools and materials

  • Level (Spirit level)
  • Rake
  • Shovels
  • Crushed Stone Aggregate

What they say

Hide

but it's not the end of the world it just means we gotta fix it so we're building uh we originally hired to build a terraced retaining wall and so you can see where tim's got the bottom wall in and then they're just digging out for the top wall i mean it's one of the

Auto-generated from the video audio.