Prepare Retaining Wall Base
2:41
12:46
64.1K views
At 2:41 in
We find Buried problems
What happens here
Once the main trench is dug to the required depth, the base where the first course of blocks will sit must be compacted. A vibratory plate compactor (often referred to as a tamper) is used to ensure a solid, stable, and level foundation. This step is critical for the structural integrity and longevity of the retaining wall. Workers use shovels, rakes, and levels to precisely prepare the base.
Goal: After initial excavation, compact the trench base thoroughly and level it. This forms the stable foundation for the first course of retaining wall blocks.
Tools and materials
- Level (Spirit level)
- Rake
- Shovels
- Crushed Stone Aggregate
What they say
(267 characters)Hide