Final Grading and Site Cleanup
11:22
12:46
64.1K views
At 11:22 in
We find Buried problems
What happens here
Once all retaining wall sections are complete and drainage systems are installed and backfilled, perform final grading of the surrounding landscape. Use a skid steer to gently contour the soil, creating a smooth transition from the wall to the existing grade and ensuring surface water drains away from the structure. Any remaining excess soil or debris should be removed from the site. This step completes the project, providing a stable, functional, and aesthetically pleasing terraced retaining wall.
Goal: Perform final grading around the newly constructed retaining walls to ensure proper surface drainage and a neat appearance, then clean up the construction site.
Tools and materials
- Rakes
- Shovels
- Skid Steer