Once the main trench for the lower wall is excavated, use a plate compactor to thoroughly compact the exposed soil subgrade. This increases the soil's density and bearing capacity, preventing future settlement. Next, spread a uniform layer of washed gravel (e.g., 3/4 inch clean stone) across the compacted subgrade. Use shovels and rakes to level the gravel, ensuring a consistent height and grade. The gravel layer serves as a permeable foundation for the retaining wall blocks, allowing for drainage and further stabilizing the structure. For concrete foundations, a similar compaction and leveling of the subgrade would be essential before pouring a concrete footing.
Goal: After initial excavation, prepare the foundation base for the lower retaining wall. This involves compacting the subgrade and laying a precise layer of gravel to ensure a solid and level starting point for the blocks.
Tools and materials
- Level
- Plate Compactor (Honda powered)
- Rakes
- Screed Board
- Shovels
- Tape Measure
- Washed Gravel (3/4 inch clean stone)
What they say
(381 characters)Hide
What they say
(381 characters)Auto-generated from the video audio.