Install Second Tier and Step-Down Sections
At 3:55 in
We find Buried problems
What happens here
Build the second tier of the retaining wall, ensuring it is positioned at an appropriate distance from the first tier (as per engineering standards, often twice the height of the lower wall) to prevent excessive pressure on the lower wall. Incorporate 'step-down' sections where the terrain changes elevation, building up the blocks in a staggered fashion to create vertical transitions. Each block is leveled, and subsequent courses are laid, with careful attention to alignment and the overall aesthetic of the tiered design. For vertical transitions, multiple blocks may be stacked to create the desired height difference for each step, with each block carefully leveled.
Goal: Continue building the retaining wall with a second tier, ensuring correct spacing from the first. Integrate 'step-down' sections to accommodate grade changes along the slope, maintaining proper height and stability.
Tools and materials
- Grinding Saw (Stihl TS 420)
- Retaining Wall Blocks
- Rubber Mallet
- Spirit Level
- Tape Measure
- Adhesive for Caps
What they say
(1,333 characters)Hide
What they say
(1,333 characters)Auto-generated from the video audio.