Transporting Materials and Laying Rock Base
At 5:18 in
Turning a Hill into a Flat(er) backyard pt/2
What happens here
The skid steer is first used to move a pallet of retaining wall blocks from the delivery truck to the site. Then, it returns to the truck to pick up a load of 3/4 inch clear sewer rock. Blaine carefully maneuvers the skid steer to dump the rock into the excavated trench, creating the initial 6-inch base for the wall's footing. The rock is spread evenly, and Sam then uses a plate compactor to thoroughly compact the rock, ensuring a solid and stable foundation. Blaine then sets the first retaining wall block, focusing on exact placement as it dictates the alignment of the entire wall.
Goal: Establish a compacted rock base and set the first block of the retaining wall.
Tools and materials
- Dump Trailer — Holding bulk rock for the skid steer
- Shovels — Spreading the rock evenly in the trench
- 3/4 inch Clear Sewer Rock — Creating the stable base layer for the wall footing
- Retaining Wall Blocks — The primary building material for the wall
What they say
(605 characters)Hide
What they say
(605 characters)Auto-generated from the video audio.