Skip to main content

Setting String Lines and Marking Footing

4:25
14:47
512.6K views

At 4:25 in

Turning a Hill into a Flat(er) backyard pt/2

What happens here

Blaine meticulously sets up a string line to mark the precise alignment and level for the retaining wall. He drives rebar stakes into the ground with a hammer at strategic points along the wall's path. He uses a handheld level to ensure the string line is perfectly horizontal, which is crucial for a straight wall. Following this, Sam uses pink marking spray paint to outline the intended footprint of the footing. He indicates that the footing will be 12 inches below the front of the grade, with 6 inches for the rock base and another 6 inches for the buried course of blocks. He also marks the back of the footing 18 inches behind the string line for the clear rock cap.

Goal: Precisely define the retaining wall's alignment and footing dimensions.

Tools and materials

  • Hammer — Driving the rebar stakes into the ground
  • Handheld Level Stanley — Ensuring the string line is level
  • Measuring Tape — Taking precise measurements for the footing dimensions
  • Rebar Stakes — Anchoring the string line for alignment
  • String Line — Providing a visual guide for the wall's alignment

What they say

Hide

blaine sets the string line to start laying out the wall that looks pretty good right right there from down here sam clears up the area before they start the cut for the footing which is separate than the cut for the general excavation the footing in this case will be 12 inches below the front of the grade that allows for six inches of rock to be used as a footing and six inches of buried course

Auto-generated from the video audio.