Shade Setup and Continued Wall Construction
At 11:15 in
Turning a Hill into a Flat(er) backyard pt/2
What happens here
Given the hot weather conditions, Sam and Blaine quickly set up a 10ft x 10ft Iron Ton pop-up canopy to provide shade over the work area. They resume the process of laying retaining wall blocks, moving in sequence along the marked string line. After each section of blocks is laid, they are 'toed in' with excavated soil, ensuring stability. The skid steer assists in bringing more excavated soil to the site for backfilling behind the newly laid courses. Sam spreads the soil with shovels, and Blaine uses the plate compactor for uniform compaction. This methodical process ensures the wall is built layer by layer, with continuous leveling and backfilling. They confirm that for the subsequent courses above the buried section, they will transition from excavated soil to 3/4 inch clear drain rock for proper drainage.
Goal: Continue laying retaining wall blocks, backfilling, and compacting while providing worker comfort.
Tools and materials
- Handheld Level Stanley — Checking block levels
- Rubber Mallet — Adjusting blocks
- Shovels — Spreading soil and leveling
- Excavated Soil N/A — Backfilling and 'toeing in' blocks
- Retaining Wall Blocks — Continued construction of the wall