Prepare Base and Set First Blocks
At 6:33 in
Turning a Hill into a Flat(er) backyard pt/2
What happens here
Spread and level the 3/4 inch clear sewer rock within the marked trench to create a uniform base for the retaining wall. Once leveled, use a plate compactor (powered by a Honda engine) to thoroughly compact the rock base, ensuring maximum stability. The first few retaining wall blocks are then carefully placed on the compacted rock, checking for levelness. If concrete is encountered near the house, use a Husqvarna cut-off saw to cut it precisely, ensuring no damage to the foundation. This saw, despite being unused for 10 months, starts up surprisingly easily. Use water during cutting to control dust. Ensure the first blocks are set as tightly as possible against the house.
Goal: Create a stable and level base, then lay the initial retaining wall blocks
Tools and materials
- Husqvarna Cut-Off Saw — Cutting existing concrete obstructions
- Level — Ensuring blocks are perfectly level
- Plate Compactor Honda — Compacting the rock base for stability
- Rake — Spreading and leveling the rock base
- Retaining Wall Blocks — The building material for the wall
- Shovel — Spreading and leveling the rock base
- Water Hose — Reducing dust while cutting concrete
What they say
(788 characters)Hide
What they say
(788 characters)Auto-generated from the video audio.