Continued Wall Construction and Backfill Management
At 11:39 in
Turning a Hill into a Flat(er) backyard pt/2
What happens here
Deploy a 10ft x 10ft pop-up canopy to provide shade for the workers as they continue to build the retaining wall. This is particularly important on hot days. Continue laying retaining wall blocks, ensuring they are level and properly aligned. Backfill behind the wall up to the height of the buried course using excavated material. Once this height is reached, switch to 3/4 inch clear drain rock for backfilling behind the remaining courses of the wall. This specialized rock allows for proper water drainage, preventing hydrostatic pressure buildup behind the wall. In areas too tight for machinery, such as directly behind the blocks, manual labor with shovels is required. Always maintain a safe compaction zone away from the blocks to prevent shifting, using a plate compactor in the open areas and hand tools for the tight spots.
Goal: Complete the retaining wall construction with proper backfilling and drainage
Tools and materials
- 10ft x 10ft Pop-Up Canopy Ironton — Providing shade for workers
- Compact Track Loader — Transporting and placing backfill material
- Hammer — Adjusting block placement and ensuring tight fit
- Level — Checking the levelness of each block
- Plate Compactor Honda — Compacting the backfill material
- Retaining Wall Blocks — Building the retaining wall
- Shovels — Manually placing and spreading backfill
- Spade — Manually placing and spreading backfill in tight areas
- 3/4 inch Clear Drain Rock — Backfilling behind higher courses for drainage
- Excavated Soil On-site — Backfilling behind the initial courses of the retaining wall
What they say
(1,392 characters)Hide
What they say