Skip to main content

Continued Wall Construction and Backfill Management

11:39
14:47
512.6K views

At 11:39 in

Turning a Hill into a Flat(er) backyard pt/2

What happens here

Deploy a 10ft x 10ft pop-up canopy to provide shade for the workers as they continue to build the retaining wall. This is particularly important on hot days. Continue laying retaining wall blocks, ensuring they are level and properly aligned. Backfill behind the wall up to the height of the buried course using excavated material. Once this height is reached, switch to 3/4 inch clear drain rock for backfilling behind the remaining courses of the wall. This specialized rock allows for proper water drainage, preventing hydrostatic pressure buildup behind the wall. In areas too tight for machinery, such as directly behind the blocks, manual labor with shovels is required. Always maintain a safe compaction zone away from the blocks to prevent shifting, using a plate compactor in the open areas and hand tools for the tight spots.

Goal: Complete the retaining wall construction with proper backfilling and drainage

Tools and materials

  • 10ft x 10ft Pop-Up Canopy Ironton — Providing shade for workers
  • Compact Track Loader — Transporting and placing backfill material
  • Hammer — Adjusting block placement and ensuring tight fit
  • Level — Checking the levelness of each block
  • Plate Compactor Honda — Compacting the backfill material
  • Retaining Wall Blocks — Building the retaining wall
  • Shovels — Manually placing and spreading backfill
  • Spade — Manually placing and spreading backfill in tight areas
  • 3/4 inch Clear Drain Rock — Backfilling behind higher courses for drainage
  • Excavated Soil On-site — Backfilling behind the initial courses of the retaining wall

What they say

Hide

it is gonna pay itself off today well sam's facing out the block blaine is towing in the course that gets buried and also prepping the base course for sam to work down on [Music] i don't know where i'm going but i don't want to know what predictable life is not what i want putting one foot down one step at a time let the road turn that's just fine people ask all the questions the box you went to classify your life with the stroke of a pen take those old rules we're burning that box right now more breakers dream makers risk but takers ever silence your voice if you think you were made just to blend right in to avoid being mistakes or to tally your sins you might get to the end doing nothing wrong to [Applause] in we're just gonna lock it in so it doesn't go anywhere and keep on stacking [Music] now this next part has confused a few people they towed the wall in both front and back using the excavated material from on-site but once they're up to the height of the buried course then behind the wall they'll switch over to three-quarter clear drainage aggregate it's only for the tow end can they use the excavated material [Music] they have to maintain a safe zone away from the blocks when they're compacting so they can use the plate packer in the front and stay at least six inches to a foot away but on the back side there's no room for it so everything has to be done by hand

Auto-generated from the video audio.