Laying Blocks and Backfilling Initial Courses

7:38
14:47
512.6K views

At 7:38 in

Turning a Hill into a Flat(er) backyard pt/2

What happens here

After the first course of retaining wall blocks is precisely set, subsequent layers are laid. Ensure each block is level and aligned using a hammer and a level. While one worker focuses on laying blocks, the other uses the skid steer to bring in excavated soil for backfill behind the wall. The backfill is crucial for structural integrity; it is placed and compacted immediately behind the blocks to 'toe in' the wall, preventing movement. The backfill behind the first few courses consists of excavated soil, but eventually transitions to 3/4 inch clear drain rock for proper drainage.

Goal: Construct the initial courses of the retaining wall and backfill for stability

Tools and materials

  • Compact Track Loader — Transporting and placing backfill material
  • Hammer — Adjusting block placement and ensuring tight fit
  • Level — Checking the levelness of each block
  • Plate Compactor Honda — Compacting the backfill material
  • Retaining Wall Blocks — Building the retaining wall
  • Shovels — Manually placing and spreading backfill
  • 3/4 inch Clear Sewer Rock — Backfilling behind higher courses for drainage
  • Excavated Soil On-site — Backfilling behind the initial courses of the retaining wall

What they say

Hide

so this will be the first wall that sam bases entirely on his own blaine is going to set the first block so that sam knows what to go off from but after that this was all sam and this real thing that i could fly that's a broken bridge after the blocks get based they've got to be towed in immediately [Music] while sam's basing and building blaine grabs a skid loader to bring in some backfills [Music] blaine has to be careful not to get any rocks in that series of lines and holes that you see on the top of those blocks if those get filled up with rocks they gotta be hand-picked clean [Music] we've been getting heavy rains every few days so they didn't want to break the trench open all at once but now they're on to the next phase of the project and they need to be very careful as they dig out that bank so they don't knock anything over into their retaining wall blaine shaves down the ground and smooths out his work song [Music] he uses the edge of the bucket to shave through the roots as well all right so we got our string line up we need to be a foot down from the string wing for the rocks and the caps we need to be six inches in front of it for a rock and we need to be 18 inches behind for rocks so that's what i was marking by marking out both the front and back of the trench sam make sure that blaine knows exactly where to take [Music] he carefully uses the skid loader to scratch out the footing he doesn't want to go too deep if he does then he's going to end up putting material back in and placing it and packing it which is just an extra step what he can't do with the machine he touches up the edges by hand we always use six inches of rock for base the only time we deviate from this plant is if we're building a wall in a swamp and we've got a soil correct the base then we'll go one to two feet thick and put geogrid in it all right well it is uh nine o'clock and 94 degrees oh yeah fun stuff but we got some mobile shade that 10 by 10 camp you 70 bucks at northern tool and i got a feeling that it is gonna pay itself off today well sam's facing out the block blaine is towing in the course that gets buried and also prepping the base course for sam to work down on [Music] i don't know where i'm going but i don't want to know what predictable life is not what i want putting one foot down one step at a time let the road turn that's just fine people ask all the questions the box you went to classify your life with the stroke of a pen take those old rules we're…

Auto-generated from the video audio.