Laying Blocks and Backfilling Initial Courses
At 7:38 in
Turning a Hill into a Flat(er) backyard pt/2
What happens here
After the first course of retaining wall blocks is precisely set, subsequent layers are laid. Ensure each block is level and aligned using a hammer and a level. While one worker focuses on laying blocks, the other uses the skid steer to bring in excavated soil for backfill behind the wall. The backfill is crucial for structural integrity; it is placed and compacted immediately behind the blocks to 'toe in' the wall, preventing movement. The backfill behind the first few courses consists of excavated soil, but eventually transitions to 3/4 inch clear drain rock for proper drainage.
Goal: Construct the initial courses of the retaining wall and backfill for stability
Tools and materials
- Compact Track Loader — Transporting and placing backfill material
- Hammer — Adjusting block placement and ensuring tight fit
- Level — Checking the levelness of each block
- Plate Compactor Honda — Compacting the backfill material
- Retaining Wall Blocks — Building the retaining wall
- Shovels — Manually placing and spreading backfill
- 3/4 inch Clear Sewer Rock — Backfilling behind higher courses for drainage
- Excavated Soil On-site — Backfilling behind the initial courses of the retaining wall