Skip to main content

Material Delivery: Blocks and Base Rock

5:18
14:47
512.6K views

At 5:18 in

Turning a Hill into a Flat(er) backyard pt/2

What happens here

Use the compact track loader (skid steer) equipped with pallet forks to carefully transport retaining wall blocks from the dump trailer to the work area. The blocks should be moved efficiently to minimize disruption and staging time. Once the blocks are moved, the skid steer is used to collect 3/4 inch clear sewer rock directly from the dump trailer. This specific type of rock is angular and contains no fines, making it ideal for the wall's base and drainage layer due to its resistance to movement. Dump the rock directly into the prepared trench.

Goal: Efficiently move retaining wall blocks and base rock to the construction site

Tools and materials

  • Compact Track Loader — Transporting blocks and rock
  • Dump Trailer — Storing and transporting bulk materials like rock
  • Pallet Forks — Lifting and moving pallets of retaining wall blocks
  • Retaining Wall Blocks — Constructing the retaining wall
  • 3/4 inch Clear Sewer Rock — Creating a stable base and drainage layer for the retaining wall

What they say

Hide

the boys have both rock and block on the dump trailer they need the rock so the blocks gotta we want to keep the street as clean as possible so we dump the rock directly in the bucket of the cab this is called three-quarter clear sewer rock it has no fines in it and it's all three-quarter angular rock in nature and we use this in both for the base and the drainage zone as soon as you pour it down it locks in place and resists movement

Auto-generated from the video audio.