What happens here

Using a chainsaw, clear any roots, debris, or obstacles from the excavated trench where the retaining wall footing will be placed. This ensures a clean and stable base. Next, using a measuring tape and pink spray paint, mark the precise depth for the footing: 12 inches below the front of the grade. This 12-inch depth accommodates 6 inches of 3/4 clear sewer rock for the footing and another 6 inches for the buried course of the retaining wall.

Goal: Prepare the trench for the footing and mark the correct depth for base materials

Tools and materials

  • Chainsaw — Clearing roots and debris from the trench
  • Measuring Tape — Measuring the footing depth
  • Pink Spray Paint — Marking the footing depth and alignment

What they say

Hide

sam clears up the area before they start the cut for the footing which is separate than the cut for the general excavation the footing in this case will be 12 inches below the front of the grade that allows for six inches of rock to be used as a footing and six inches of buried course the boys have both rock and block on the dump trailer they need the rock so the blocks gotta we want to keep the street as clean as possible so we dump the rock directly in the bucket of the cab this is called three-quarter clear sewer rock it has no fines in it and it's all three-quarter angular rock in nature and we use this in both for the base and the drainage zone as soon as you pour it down it locks in place and resists movement