Skip to main content

Final Inspection and Cleanup

5:40
7:45
2K views

At 5:40 in

TREE FALLS ON CUSTOMER’S HOME ELECTRICAL SERVICE! - Day in the Life of a Father and Son Electrician

What happens here

Once all the necessary straps have been installed, perform a thorough visual inspection of the entire SEU cable run. Ensure that the cable is firmly and evenly secured to the house wall, with no loose sections or excessive tension. Compare the finished result to the previous damaged state, confirming that the repair is complete and robust. Afterwards, safely dismantle the scaffold and return the tools to storage.

Goal: Verify the successful re-strapping and ensure safety.

What they say

Hide

Nice baker scaffold. Yeah, there you go. Perfect. I think it's all we need. Yes, sir. All righty. All finished. Take a look at this. We got it strapped. See, we got our SCU straps. Before it was ripped off, guys. This was ripped off completely, but we restrapped it all the way to the top. And it was a challenge, guys, cuz right here it was very uneven. The we were basically on a hill, so we had to get a scaffold. We couldn't use a normal ladder, but guys, all finished. Let's get it. Customer satisfied. And yeah, that's how we do

Auto-generated from the video audio.