Off-site Material Disposal
3:32
14:18
29K views
At 3:32 in
Track Froze up and Locked out on a Job. 4 k video
What happens here
Upon arrival at the disposal site, the dump trailer is raised to unload the concrete debris. The operator explains that despite the trailer appearing partially empty by volume, the weight of the dense concrete material means it is near its legal hauling capacity of 19,000 pounds. This highlights the importance of understanding material density and weight limits for safe and legal transport.
Goal: Safely and legally dispose of the concrete debris.
Tools and materials
- Dump Trailer Sure-Trac — Unloading debris
- Pickup Truck Ram — Towing the dump trailer
- Concrete Debris N/A — Material being disposed of
What they say
(542 characters)Hide
What they say
(542 characters)Auto-generated from the video audio.