Initial Concrete Loading and Transport
0:31
14:18
29K views
At 0:31 in
Track Froze up and Locked out on a Job. 4 k video
What happens here
Using the ASV RT-75 compact track loader equipped with a grapple attachment, the crew begins the process of loading large, snow-covered concrete slabs from the demolition pile into a Sure-Trac dump trailer parked on the street. The grapple allows for precise and secure handling of the heavy and irregularly shaped concrete pieces, facilitating efficient loading.
Goal: Load the first batch of concrete debris into the dump trailer.
Tools and materials
- Compact Track Loader ASV RT-75 — Operating and moving debris
- Dump Trailer Sure-Trac — Receiving and transporting the debris
- Grapple Attachment — Grabbing and securing concrete slabs
- Concrete Slabs N/A — Demolition waste being loaded