Repeat Courses, Backfill, and Compact
At 0:48 in
This is going to sound crazy.... 4K
What happens here
This step involves the repetitive process of laying blocks, installing geogrid, backfilling with aggregate, and compacting the fill. Each course of blocks must be checked for level and alignment. Geogrid is extended into the excavated area behind the wall and then covered with aggregate, which is compacted to create a stable mass with the wall blocks. This systematic layering and reinforcement are essential to create an engineered retaining wall capable of resisting soil pressure and any dynamic loads, such as those caused by tree roots or external forces.
Goal: Continue stacking subsequent courses of retaining wall blocks, integrating geogrid as specified in the engineered design. Follow each block and geogrid installation with backfilling and thorough compaction until the wall reaches its final intended height.
Tools and materials
- Aggregate (Crushed Stone)
- Excavator
- Geogrid
- Plate Compactor
- Retaining Wall Blocks
- Shovels and Rakes
- Skid Steer Loader
- Spirit Level and String Line
What they say
(588 characters)Hide
What they say
(588 characters)Auto-generated from the video audio.