Skip to main content

Lay Retaining Wall Blocks with Geogrid

0:17
12:52
19.7K views

At 0:17 in

This is going to sound crazy.... 4K

What happens here

Workers carefully place each retaining wall block onto the prepared base, checking for levelness and alignment. After certain courses (as per engineering specifications, potentially every 2-3 courses), a layer of geogrid (a high-strength polymer mesh) is rolled out behind the blocks. The next course of blocks is then placed on top of the geogrid, anchoring it in place. The geogrid extends back into the soil, providing tensile strength and preventing soil movement behind the wall. This process is repeated for each subsequent course.

Goal: Systematically lay each course of retaining wall blocks, ensuring they are level and interlocked. Incorporate geogrid at specified intervals behind the blocks to reinforce the soil and provide structural integrity, especially for tall walls or those subject to dynamic loads.

Tools and materials

  • Geogrid (Soil Reinforcement Fabric)
  • Measuring Tape
  • Retaining Wall Blocks
  • Rubber Mallet or Hammer
  • Spirit Level

What they say

Hide

talk a little bit about that but we're going to talk about a lot of other things that I don't normally speak of uh during my videos so sit back relax and uh I hope you guys enjoy the ride today [Music] yeah it goes all the way around the whole perimeter of the base at that same elevation so here's the thing when you're stepping down like that because it we're running great at that level over here to balance

Auto-generated from the video audio.