What happens here

This step shows the initial stages of retaining wall construction. The crew begins by preparing the ground, which involves excavating a trench for the wall's base and leveling the foundation. Gravel is then laid as a base material. Initial courses of retaining wall blocks are carefully placed and leveled, establishing the foundation of the wall. A Kubota SVL 75-2 compact track loader and a Daewoo 75V mini excavator are used for earthmoving and material handling.

Goal: The crew prepares the ground by excavating and leveling the base, followed by laying gravel and the first courses of retaining wall blocks to establish a solid foundation.

Tools and materials

  • Daewoo 75V Mini Excavator
  • Kubota SVL 75-2 Compact Track Loader
  • Levels
  • Rubber mallet
  • Shovels
  • Gravel
  • Retaining wall blocks

What they say

Hide

good morning good evening good afternoon one and all today we got a pretty complicated project and we're going to talk a little bit about that but we're going to talk about a lot of other things that I don't normally speak of uh during my videos so sit back relax and uh I hope you guys enjoy the ride today [Music] yeah it goes all the way around the whole perimeter of the base at that same elevation